12th August – 6.30pm : The residents’ meeting with no interaction

Rendall and Rittner have decided to hold the twice yearly so called ‘residents’ meeting’ purely online.  A justifiable decision perhaps, due to COVID19 but what is not  justifiable is making the meeting ‘broadcast… Continue reading

Over 200 extremely dissatisfied residents from ten developments send open letter to Rendall and Rittner

‘Enough Is Enough’ An Open Letter to Rendall & Rittner 21st July 2020 FINAL Appendix open letter to R&R 21.7.20 AMENDED Over 200 residents from TEN London developments managed by Rendall and Rittner… Continue reading

Rendall and Rittner fail to tell residents about two weeks of heavy drilling at Chelsea Bridge Wharf

On the 1st August heavy drilling works started in P2 car park. This apparently is to do with the replacement of expansion  joints and will last for 2 weeks. The Rendall and Rittner… Continue reading

Fire at Chelsea Bridge Wharf

It is a great relief that no-one was apparently hurt in the fire at Oswald Building, Chelsea Bridge Wharf on 27th June 2018.  This is despite the fact that there is some flammable… Continue reading

Protecting consumers in the letting and managing agent market: call for evidence

The government consultation on cracking down on abuses by managing agents and letting agents closes today at 11.45 pm https://www.gov.uk/government/consultations/protecting-consumers-in-the-letting-and-managing-agent-market-call-for-evidence Residents are encouraged to give their views about Rendall and Rittner’s management at… Continue reading

Routine speeding and dangerous driving on Sopwith Way

Routine speeding on Sopwith Way. The 5mph speed limit is ignored due to lack of any serious traffic calming or speed limit enforcement by the managing agents (Rendall & Rittner) and the Developer… Continue reading

Rendall & Rittner censor notes of residents’ meeting at Chelsea Bridge Wharf

Below is the text of an official complaint which I made to Rendall & Rittner  regarding the notes of  the last residents’ meeting (October 2016). The notes, which were not circulated for more than a month after the meeting, systematically censored the vocal… Continue reading

Rendall & Rittner – no plans to consult residents on real issues at Chelsea Bridge Wharf

At a meeting this evening (9th March), supposedly to discuss ”The Community Plan” for Chelsea Bridge Wharf and Vista, Rendall & Riitner confirmed that they had no plans to consult residents about either… Continue reading

Rendall & Rittner contractor doing 50mph in 5mph zone

Rendall & Rittner refuse to enforce the speed limit on this road which they are responsible for managing. Karen Ann Gray of Rendall & Rittner tells me that she is satisfied with existing… Continue reading

Battersea Power Station traffic speeding through pedestrians – Rendall & Rittner not interested

Rendall & Rittner are responsible for managing this road but have allowed it to become dangerous. Despite numerous resident requests they claim they can do nothing about the fact that 100% of the… Continue reading